|
CTS PRO REPORTS
OM'S
|
DMS
OM
Report
Samples
There are
many other
DMS
Reports
besides the reports listed below... |
| OM
LMD Report
T-2x288 |
Description:
OM group LMD (Line
Traffic) provides traffic information for the following peripheral
modules (PM): remote line modules (RLM), line concentrating
modules (LCM), virtual line concentrating modules (VLCM), remote
concentrator terminals (RCT), remote concentrator subscribers
(RCS), integrated services line modules (ISLM), digital line
modules (DLM), very small remotes (VSR), enhanced line
concentrating modules (ELCM), integrated services digital network
(ISDN) line concentrating modules (LCMI), intelligent peripheral
equipment (IPE) line modules (LM).
The LMD report shows the usage per
poll interval on all of the fields listed below for the
observation period. It also calculates the CCS per Attempt, % ORIG
and % TERM. Totals are displayed at the bottom of the report. It
also displays the maximum usage per day for the following areas:
All intervals and when that interval ended, the max interval of
the Business hours and when that interval ended, and the max of
the Off Business Hour Intervals and what time that ended. LM lines
and CCS/Lines are also shown in the max usage section.
Fields required for
OM LMD reports:
|
NTERMATT |
NORIGATT |
LMTRU |
TERMBLK |
|
ORIGFAIL |
PERCLFL |
STKCOINS |
REVERT |
|
MADNTATT |
ORIGBLK |
ORIGABN |
|
Download:
T-23288 Hourly OM LMD
Report
|
| OM
OFZ
Report
T-2x295 |
Description:
OM group OFZ
(Office Traffic Summary) provides information for traffic
analysis. The OM group OFZ uses a primary route scoring
philosophy. This OM group differs from OTS because OFZ counts
calls for the intended destination, not the destination where the
call terminates.
The OFZ report shows the usage per
poll interval on all of the fields listed below for the
observation period. Totals are displayed at the bottom of the
report. It also displays the maximum usage per day for the
following areas: All intervals and when that interval ended, the
max interval of the Business hours and when that interval ended,
and the max of the Off Business Hour Intervals and what time that
ended.
Fields required for
OM OFZ reports:
|
NORIG |
ORIGTRM |
ORIGLKT |
ORIGABDN |
|
ORIGTONE |
ORIGANN |
ORIGOUT |
NIN |
|
INOUT |
INLKT |
INABNM |
INABNC |
|
INTONE |
INANN |
INTRM |
OUTNWAT |
|
TRMNWAT |
TRMMFL |
TRMBLK |
LNMBPC |
Download:
T-24295 Daily OM
OFZ Report
|
| OM
TRK
Report
T-2x335 |
| Description:
OM group TRK (Trunk Group) provides
information on trunk traffic for each trunk group.
The TRK report shows the usage per
poll interval on all of the fields listed below for the
observation period. Totals are displayed at the bottom of the
report. The % ORIG COMP, % TERM COMP, % OVFL, % CAPACITY and
IN/TOT COMP is also calculated. It also displays the maximum usage
per day for the following areas: All intervals and when that
interval ended, the max interval of the Business hours and when
that interval ended, and the max of the Off Business Hour
Intervals and what time that ended.
Fields required for
OM TRK reports:
|
INCATOT |
PRERTEAB |
INFAIL |
NATTMPT |
|
NOVFLATB |
GLARE |
OUTFAIL |
DEFLDCA |
|
DREU |
PREU |
TRU |
SBU |
|
MBU |
OUTMTCHF |
CONNECT |
TANDEM |
|
AOF |
ANF |
TOTU |
ANSWER |
|
INVAUTH |
BLKCTRK |
MAXBU |
TRU2WIN |
|
NCTPASS |
NCTFAIL |
ACCCONG |
NOANSWER |
|
INANSWER |
OUTANSU |
INANSU |
ANSU |
|
NANS |
CONGEST |
|
|
Download:
T-27335 OM TRK
Summary Report
T-29070
OM TRK Daily % Completion Report |
|
Additional CTS PRO Resources


 
|